A Guide to Demolition Services

1

Through the years, contractors are needed to be hired to tear down superstructures and other architectures in order to make way for a new building to takes it place on that certain property. Several common methods are available on how to demolish a building: manually, implosion and deconstruction. When demolishing a smaller building, the process is a lot simpler because it only requires is manual labor or mechanical through the help of hydraulic equipment, like bulldozers, excavators, cranes and inclined work platforms. Although, with huge buildings a wrecking ball is used. According to history, the largest building that was ever demolished in history was back in 1967 and 1968, it was the 1908 Singer Building in New York City that has 47-storeys and was replaced by One Liberty Plaza. Before demolishing and clearing the site, it should be planned extensively. It is crucial for the site plan to be developed with precise details concerning the landscape elements that are to be taken off, relocated or modified. There should be locations for dump piles, entrance and exits of the site, fences, staging areas and etc.

Trees are removed when necessary from the site in question, information about the tree to be removed should be reviewed a year in before. Landscape plants and trees that are remained on the property should be properly protected. This is done through non-movable construction fence.

If there are site materials to be reused, like topsoil, subsoil and gravel, it should be specifically stated. If a site is now cleared for demolition, it is mandatory to put up signs to control and detour for the upcoming traffic. The signs requires specific requirements in due respect to size, design, type and space. The contractor working on the site for clearing and Easton Excavation services will be held responsible for the clearing and disposing of the debris according to laws and ordinances depending on its region.

Remember that another responsibility of the contractor is to ensure that adjacent sidewalks and streets are undamaged and when there may be damages caused by the construction, it will be repaired to its original condition on the contractor’s expense. It is also critical to make sure that all utility services like water, gas, electricity, steam and telephone are cut off before any construction. Sewers are to be sealed before the demolition process. As soon as demolition starts, the contractor makes sure that the process will not interfere with the adjacent property and not bother people on the adjacent property or any passage near the demolition area. Basically, Ocean City Demolition is a collaborative effort that entails participation of all contractors. Using the right safety precautions and following the rules and ordinances of the state.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s